Nordbex One is an industrial energy project developed according to the Nordbex model. The facility combines energy generation with integrated carbon capture and is currently undergoing the planning and environmental permitting process. The project is designed for long-term operation and integration with the local energy system.
About the project
Nordbex One is being developed as a large-scale energy facility that combines dispatchable energy production with integrated carbon capture.
The project is designed to contribute to reliable energy supply while enabling the capture and management of biogenic carbon dioxide. Development follows a structured process including planning procedures, environmental permitting and financing prior to construction.
Project leadership
Nordbex One is led by an experienced project team responsible for the planning, permitting and development of the facility.
Niklas Lindvall
CEO, Nordbex One
Responsible for overall project development, financing and long-term project structure.
Gustaf Tillback
Project Manager, Nordbex One
Responsible for project planning, coordination and technical development.
Integration with the local energy system
Nordbex One is designed to operate as part of the local energy infrastructure. The facility is developed to integrate with existing energy systems and provide stable energy production over time.
By combining energy generation with carbon capture, the project forms part of a broader industrial energy system designed for long-term operation.
Planning and permitting process
Development of Nordbex One follows established planning and environmental permitting procedures. Each stage of the process is reviewed independently before the project can proceed to the next phase.
Planning process
The planning process evaluates land use, infrastructure and integration with surrounding development.
Environmental permitting
Environmental assessment evaluates emissions, noise, transport flows and other environmental factors in accordance with applicable legislation.
Permits before construction
Construction can only begin once all required permits have been granted and regulatory conditions have been established.
Project status
Nordbex One is currently in the planning and environmental permitting phase. The project is undergoing the necessary regulatory reviews and consultations required before further development stages can proceed.
Future milestones and updates will be presented as the process progresses.
Frequently asked questions
How could the project affect nearby communities?
Potential impacts such as noise, transport and emissions are evaluated during the environmental permitting process. Permit conditions are set by authorities and monitored through regulatory oversight.
How are transport flows handled?
Transport volumes and routes are assessed during environmental permitting. Traffic impact, logistics and safety considerations are reviewed before permits can be granted.
How can I access information or submit comments?
Information is provided as part of the planning and permitting process. Opportunities to submit comments are available through the formal consultation procedures associated with these processes.
Will the project create local jobs?
Construction and operation require contractors, suppliers and operational staff. The exact number of jobs will depend on the final project design and procurement processes.
What stage is Nordbex One currently in?
The project is currently in the planning and environmental permitting phase. The current status and upcoming steps are presented in the Project status section.
What happens if the project does not receive permits?
If the required permits are not granted, the project cannot proceed.
Contact Nordbex One
If you would like more information about the project or the development process, please contact the Nordbex team
Telephone
The Stockholm office
Jan Stenbecks torg 17, 164 40
The Nybro office
Gamla Stationsgatan 7 b, 382 30 Nybro
Get in touch
Fill out the form and tell us what you’re reaching out about. We aim to reply within 48 hours.